Assumptions β€” EDR Smart Trade Corridor

Source-tagged model assumptions, fee schedule inputs, and adoption parameters that drive the interactive revenue estimates.

Crawlable Data Summary

The key figures below are rendered in HTML for search and AI crawlers. Interactive controls in the dashboard can adjust estimates, but these defaults provide a stable baseline for indexing and analysis.

Year 2 total: $10,676,762

Year 1 total: $8,663,445

Current freight: ~4,000,000 tons

FX snapshot: 1 USD = 155 ETB

Crawlable section URLs

EDR SMART TRADE CORRIDOR

Digital Platform Revenue Model

1 USD = 155 ETBLocked snapshot March 27, 2026

All ETB plan figures kept at original values. USD conversions use 155 for display only.

About This Model

Developed by Sino Africa Trading PLC(Program Architect & Strategic Developer) for EDR (Ethio-Djibouti Railway) leadership. Consortium: PWCT / Agility Global, Sino Africa, TooSharp Engineering. Assumptions cite the Strategic Plan annexes, project team inputs, and market references. Detailed revenue math is on the Revenue Model tab.

Legend

EDR Strategic Plan Estimated Market Reference

Exchange Rate

USD / ETB β€” Current

1 USD = 155 ETB

Market-aligned snapshot locked March 27, 2026 for corridor fee translation. EDR Mid-Term Plan assumed 130 ETB/USD (July 2025). Approx. 16% ETB depreciation vs plan rate; ETB plan figures are not restated.

ETB Plan Rate β€” Reference

1 USD = 130 ETB

EDR Mid-Term Strategic Plan 2025–2028, Annex 8 footnote β€” preserve original ETB values when comparing to plan-era documents.

Volume & Market Size

Current Freight Volume

~4M tons

Baseline corridor throughput validated by the project team (Feb 2026). Anchors Annex 2 mix for the β€œCurrent ~4M” scenario.

EDR Plan Β· Project team Feb 2026

Freight Volume Trajectory

2.77M β†’ 5.4M

Planned ramp from Plan Year 1 through Plan Year 3 per Annex 2 Freight Transport Annual Plan β€” drives scenario chips on the Revenue Model tab.

Annex 2 Freight Transport Annual Plan

Passenger Volume

326K β†’ 563K

Passenger transport forecast per Annex 6 β€” used for booking-fee scaling and Strategic Plan KPI context.

Annex 6 Passenger Transport Forecast

Total Freight Clients

~1,200

Addressable importer/exporter base across corridor modes β€” adoption % applied against this pool for subscription and transaction models.

Estimated Β· Project Plan p.7

National Cargo Share Target

16% β†’ 30%

KPI K8 trajectory from Annex 1 β€” corridor share of national logistics volume.

KPI K8 Β· Annex 1

Platform Fee Schedule

Each line shows the modeled value, source type (see Legend), rationale, and traceability. Sliders on the Revenue Model tab may override defaults.

Tonnage & coverage

Estimated

Revenue cargo fee

$1.75/ton

Applies to revenue tons (excludes empty-container share). Scales with Annex 2 freight mix and ton-coverage % on the model.

Estimated Β· Revenue Model default

Estimated

Empty container fee

$0.50/ton

Reduced rate on empty-container tons (~2.8% of covered tons) when β€œapply reduced rate” is enabled in the model.

Estimated Β· Model toggle

Estimated

Ton coverage on platform

80%

Share of corridor tons filed through Smart Corridor; Year 2 auto-ramps per model rules.

Estimated Β· Core assumptions

Manifest fees

EDR Strategic Plan

Sea vessel manifest

$97/vessel

Digital filing fee per eligible sea vessel call at modeled adoption; scales with vessel slider.

EDR Strategic Plan Β· Fee schedule extract

EDR Strategic Plan

Land / rail manifest

$9.75

Per truck/rail manifest submitted digitally; scales with land/rail volume and adoption %.

EDR Strategic Plan Β· Fee schedule extract

Transactional & corridor services

Estimated

Transaction processing

$8 (band $8–$10)

Per billable digital event; model uses the low end of the published band unless you move the slider.

Estimated Β· Fee schedule band

Estimated

GPS / IoT tracking

$15/shipment

Per trackable shipment: active clients Γ— shipments/client Γ— GPS adoption Γ— $15 (see Revenue Model for full formula).

Estimated Β· Model (GPS section)

Market Reference

White Glove clearance

$150/shipment

Premium managed clearance on a subset of shipments; aligns with market reference range $100–300.

Market Reference Β· Cross-check Platform Fee

Estimated

Import / Export handling

$15/shipment

Per eligible I/E shipment at modeled digital adoption; corridor volume from I/E slider.

Estimated Β· Model (I/E section)

Estimated

Passenger digital booking

$2 (band $2–$5)

Per digital booking on Annex 6 passenger base; model uses low end unless you raise the fee slider.

Estimated Β· Annex 6 passenger forecast

Subscription Tiers

Loyalty $30/mo β€” corridor loyalty bundle for recurring shippers.

Premium $75/mo β€” priority desk + analytics add-ons.

Non-Member $0 β€” pay-per-use digital access.

Mix assumption: 30% Loyalty + 8% Premium of active clients (remainder non-member or transactional-only).

✨ New Revenue Streams

FF / Multimodal: 3% capture of EDR Global Logistics (Annex 8 line β€” 2.46B ETB Y1 anchor).

Corridor Data & Analytics: $500/mo per subscriber (15 subscribers baseline).

White Glove Clearance: $150/shipment β€” cross-reference Platform Fee Schedule.

Warehouse β€” Storage Mgmt.: digital platform fee only ($2/daybeyond free time) on top of EDR's existing storage tariff β€” Annex 8 / Indode context.

Warehouse β€” Load/Unload (Indode): digital recording fee ($5/event); physical handling revenue remains EDR's. ~85% of volume at Indode per plan.

Adoption & Ramp Assumptions

Year 1: 80% adoption of addressable clients.

Year 2: 95% adoption β€” expanded digital mandate.

Throughput: 150 transactions / client / year (low end of the fee schedule band; each shipment generates multiple billable events).

PWCT Benchmark β€” Kuwait: 4Γ— faster clearance vs manual baseline (Plan p.3) β€” informs White Glove and handling adoption narratives.

Model Metadata

Developed bySino Africa Trading PLC β€” Program Architect & Strategic Developer
For presentation toEDR (Ethio-Djibouti Railway) leadership
Consortium partnersPWCT / Agility Global Β· Sino Africa Β· TooSharp Engineering
Based onEDR Mid-Term Strategic Plan 2025–2028 (July 2025)
Exchange rate locked1 USD = 155 ETB as of March 27, 2026
Plan rate (reference)1 USD = 130 ETB (EDR Strategic Plan assumption, July 2025)
Volume basis4M tons (Feb 2026 actuals) β€” ahead of EDR Plan Y2 target of 3.67M
ETB plan figuresKept at original values β€” NOT restated at current FX
New streamsZero revenue today β€” all processes are currently manual
PrincipleLow-end fee ranges Β· Phased adoption Β· All assumptions documented above